GOST 15.902-2014 PDF

GOST 15.902-2014

Name in English:
GOST 15.902-2014

Name in Russian:
ГОСТ 15.902-2014

Description in English:

System of development and launching into manufacture. Railway rolling stock. Procedure of development and launching into manufactureю With AMD 1

Description in Russian:
Система разработки и постановки продукции на производство. Железнодорожный подвижной состав. Порядок разработки и постановки на производство. С Изменением № 1
Document status:
Active

Format:
Electronic (PDF)

Page count:
40

Delivery time (for English version):
1 business day

Delivery time (for Russian version):
1 business day

SKU:
GOST05255

Choose Document Language:
€10

Full title and description

GOST 15.902-2014 — System of development and launching into manufacture. Railway rolling stock. Procedure of development and launching into manufacture. The standard establishes unified procedures for the development, testing, acceptance and placing into production of new and modernized railway rolling stock and their constituent parts (locomotives, multiple-unit sets, passenger and freight wagons, special rolling stock and components), and defines documentation, test programs and acceptance actions required during stages of product lifecycle.

Abstract

This intergovernmental GOST specifies the process stages and organizational-methodical requirements for preparing technical requirements, performing research and design work (including prototype construction and testing), and for the formal procedures to set railway rolling stock into serial production. It is intended to ensure that development and production activities meet safety, reliability and regulatory requirements applicable to railway transport.

General information

  • Status: Active as a national/interstate standard with partial suspension or amendment of specific clauses (certain paragraphs were suspended or amended by Rosstandart orders in 2017; see national registry for details).
  • Publication date: Registered/issued in 2014; introduced into effect for application in 2015 (dates of registration and entry into force appear as 2014–2015 in national records).
  • Publisher: Federal Agency for Technical Regulation and Metrology (Rosstandart) / national standards bodies of the CIS.
  • ICS / categories: Railway engineering / product development and production systems (included in the SRPP — System of development and placing products into production).
  • Edition / version: Original issue 2014 (GOST 15.902-2014); later amendments and updates noted in national registries and amendment projects.
  • Number of pages: Approximately 40 pages (typical published text length in commercial distributions).

Scope

The standard applies to the full lifecycle stages relevant to placing railway rolling stock (and constituent parts) into production: formation and approval of initial technical requirements (TT), experimental-design work (R&D and prototype stages), manufacture (including 'setting into production' and established serial production) and modernization activities. It covers documentation content (for example technical assignment structure), recommended test programs, acceptance and qualification commission procedures, and organizational responsibilities among participants (developer, customer, infrastructure owner and regulatory/oversight bodies). The scope explicitly includes locomotives, motor-traction rolling stock, passenger and freight wagons, special-purpose rolling stock and component assemblies.

Key topics and requirements

  • Formation and approval of technical requirements (TT) including intended use, operating conditions and compliance constraints.
  • Stages of experimental and design work (including development of technical documentation, model/prototype construction and iterative testing).
  • Development and approval of test programs, test protocols and reporting requirements for prototype and pre-production trials.
  • Procedures for acceptance commissions, qualification commissions and acts documenting readiness for production.
  • Requirements for placing products into production, organizing controlled operation and transitioning to serial manufacture.
  • Provisions for modernization and modification of existing rolling stock, including documentation and testing obligations.
  • Interaction and coordination roles among developer, customer, infrastructure owner and regulatory bodies to ensure operational compatibility and safety.

Typical use and users

Primary users are railway vehicle designers and manufacturers, engineering departments of rolling stock producers, procurement and project teams of railway operators, regulatory authorities responsible for vehicle certification and safety, and test organizations performing type and acceptance trials. The standard is used when preparing technical assignments, planning test programs, organizing prototype trials and formalizing the transfer of a model to serial production or to modernization programs.

Related standards

GOST 15.902-2014 is part of the SRPP (System of development and placing products into production) family and cross-references a number of normative documents used in design, documentation and testing (examples include GOST 15.101, GOST 15.016, various GOST standards for technical documentation and testing, and technical regulations for railway rolling stock of the Eurasian Customs Union). Implementers commonly consult the cited GOSTs and applicable technical regulations when applying procedure and test-related clauses.

Keywords

railway rolling stock, development process, placing into production, technical assignment (TT), prototype testing, acceptance commission, qualification, modernization, SRPP, Rosstandart.

FAQ

Q: What is this standard?

A: GOST 15.902-2014 is an intergovernmental/national standard that defines the procedure for development, testing and placing railway rolling stock and their parts into production. It sets process, documentation and testing requirements to ensure products meet safety and operational requirements.

Q: What does it cover?

A: It covers the stages from forming initial technical requirements through experimental-design work, prototype trials, acceptance and qualification, and finally organizing the introduction into serial production and controlled operation, including modernization activities.

Q: Who typically uses it?

A: Railway vehicle designers and manufacturers, operator engineering and procurement teams, certification and regulatory bodies, testing laboratories and organizations involved in rolling stock lifecycle management.

Q: Is it current or superseded?

A: The standard was issued in 2014 and introduced into national practice in 2015; certain clauses were subject to suspension or amendment by Rosstandart orders in 2017 and subsequent amendment projects have been recorded. Users should consult the current national registry or the official text to determine the presently active clauses and any amendments.

Q: Is it part of a series?

A: Yes — it belongs to the "System of development and placing products into production" (SRPP) series of standards that govern product development, documentation and production preparation across industries, with specific application to railway rolling stock in this document.

Q: What are the key keywords?

A: Railway rolling stock, development, placing into production, technical assignment, prototype testing, acceptance commission, qualification, modernization, SRPP.