Thermoplastics pipes, fittings and assemblies for the conveyance of fluids. Determination of the resistance to internal pressure. Part 4. Preparation of assemblies
Gas-fired central heating boilers, type B boilers, of nominal heat input exceeding 70 kW, but not exceeding 300 kW. The general technical requirements and test methods