Hydro power plants. Part 1-6. Hydroelectric power station constructions hydraulic engineering. Requirements on loadings and influences (wave, ice and from courts)
Materials for printed boards and other interconnecting structures. Part 2-7. Reinforced base materials clad and unclad. Epoxide woven E-glass laminated sheet of defined flammability (vertical burning test), copper-clad
State system for ensuring the uniformity of measurements. State verification schedule for means measuring plasma temperature of 10000-15000 K in the visible and ultraviolet
€10
Ask a question
Message sent
Your message has been sent. Our experts will respond you shortly. Thank you!