Renewable power engineering. Wind power engineering. Wind turbines. Part 21. Measurement and assessment of power quality characteristics of grid connected wind turbines
Document status: Active
Safety of primary and secondary lithium cells and batteries during transport
Document status: Replaced by GOST R IEC 62281-2020
Tests for electric cables under fire conditions. Circuit integrity. Part 31. Procedures and requirements for fire with shock. Cables of rated voltage up to and including 0,6/1,0 kV
Document status: Cancelled
Residual current operated circuit-breakers with integral overcurrent protection for household and similar uses (RCBO`s). Part 2-1. Applicability of the general rules to RCBO's functionally independent of line voltage
Document status: Cancelled
Nuclear power vessel-encapsulated pressurized-water reactor. General requirements to in-core reactor monitoring system
Document status: Active
Connecting devices. Safety requirements for screw-type and screwless-type clamping units for electrical copper conductors. Part 2. Particular requirements for conductors from 35 up to 300 sq. mm
Document status: Replaced by GOST IEC 60999-2-2023