Russian standards
Hydro power plants. Part 3-1. Hydraulic turbines. Procurement specification
Document status: Replaced by GOST R 55260.3.1-2020
Design and installation of electrical installations of coal mines and underground workings
Document status: Active
Hard magnetic sintered materials on basis neodymium-iron-boron alloys. Classification. Main parameters
Document status: Active
Rotating electrical machinery. Insulating collector plates. Row of thicknesses
Document status: Active
Electrohydraulic governors for hydraulic turbines. Technical requirements
Document status: Active
Refrigerating systems and heat pumps. Safety and environmental requirements. Part 2. Design, construction, manufacture, testing, marking and documentation
Document status: Replaced by GOST 34891.2-2022