Перейти к содержимому
Низкие цены. Оригиналы и переводы — экономьте время и бюджет.

ASTM E1368-23 PDF

Standard Practice for Visual Inspection of Asbestos Abatement Projects

Название (английский):
ASTM E1368-23

Standard Practice for Visual Inspection of Asbestos Abatement Projects

Статус документа:
Действующий
Формат:
Электронный (PDF)
Количество страниц:
16
Дата публикации:
1 мая 2023 г.
Издание:
E1368
ICS:
13.030.30
Описание (английский):

SIGNIFICANCE AND USE 5.1 This practice applies to response actions for all types of asbestos-containing materials, including surfacing materials, thermal systems insulation, and miscellaneous materials, whether friable or not, regardless of the quantities involved and the reason for conducting the response action. 5.1.1 Abatement for the purpose of removing asbestos-containing materials or encapsulating or enclosing them, regardless of the engineering controls and work practices used, requires performance of visual inspections as described in this practice. 5.1.2 Operations and maintenance (O&M) activities, such as removal, encapsulation, or enclosure of asbestos-containing materials incidental to repair or replacement of a component, clean-up of debris from a fiber release episode, or other preventive measures, require the performance of visual inspections as described in this practice. See Managing Asbestos in Place7 and Guidance Manual. 5.1.3 This practice applies to response actions performed under a contract from the building owner, as well as to work performed by the building owner's staff. 5.2 The specific objectives of the visual inspection process before, during, and at the conclusion of an asbestos abatement project are: to review the extent of asbestos-containing material (ACM) within the scope of work, to monitor performance of the work, and to verify if visible residue, dust or debris, or unremoved material are absent at the completion of removal and clean-up activities. 5.2.1 The visual inspection process is used to evaluate all four aspects of an asbestos abatement project as follows: 5.2.1.1 Extent of ACM within Scope of Work—The building survey which is intended to locate and quantify asbestos-containing materials is not properly called a “visual inspection” within the context of this practice. To define the extent of ACM involved, a building survey is a necessary prelude to the first step of the visual inspection process. The building survey, which ma... SCOPE 1.1 This practice covers procedures for performing visual inspections of asbestos response actions to: 1.1.1 Establish the extent of the required work before it begins; 1.1.2 Determine the progress and quality of the work and evaluate the completeness of the response action; and 1.1.3 Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers. 1.2 This practice can be used on an abatement project, or for operations and maintenance (O&M) work, performed by the building owner's staff. It can also be used in conjunction with contract documents between the building owner and other parties involved in an abatement project. Note 1: Standard contract documents (such as AIA and EJCDC documents) define contractual relationships and responsibilities for projects within the construction industry. Asbestos abatement projects differ from traditional construction projects in the manner of their design and execution, as well as in the type and level of oversight required to substantiate their successful completion. Non-traditional responsibilities are given to the building owner, project designer, and abatement contractor by this practice. Furthermore, responsibilities related to project oversight, inspections, and approvals are placed upon an additional non-traditional representative of the building owner; the project monitor, as defined by this practice. All parties are cautioned that the subject authorities and corresponding responsibilities be understood, mutually agreed upon, and correspondingly addressed with appropriate modifications, if necessary, to the contract documents for a specific project. 1.3 This practice provides the following information: 1.3.1 The objectives of the visual inspection process; 1.3.2 The responsibilities and qualifications of the individuals involved in the visual inspections; 1.3.3 The...

Технические детали

Технический комитет
D22 - Air Quality
SKU
ASTM E1368-23